Shenzhen Each House Technology Co., Ltd

Shenzhen Each House Technology Co., Ltd

进入中文版 ENGLISH
Products Category
Contact Us

Name: Michelle Yin
Tel: +86-83249850
Fax: +86-83249850
Mobile: +86-13823510166
E-mail: 13823510166@139.com
Add: 3/F,Bldg. 4, Seg Industry Park, Zhenxing Road, Shenzhen City, China
QQ: 82865748,565154145

Energy Audit and Registration

Author : 13823510166 Date : 2021-4-17 22:20:10
 

Conduct Energy Audit under Building Energy Efficiency Ordinance cap. 610 on the followings:

i. Electrical installations – distribution system, power factor

ii. Heating and Air conditioning system – building insulation, VSD, waste heat utilization

iii. Lighting – LED, PIR activated lighting, smart lighting

iv. Lifts and escalators – VFC, less dissipation equipment

v. Controls and automation


Propose Solutions

i. Propose within existing system equipment repair, new equipment replacement and installation, re-design of existing system, new system design

ii. Propose new energy system design like solar and wind power system design and installation

iii. Assist customers to apply for certificate of registration of ENERGY EFFICIENT BUILDING if proposals have been implemented.

iv. Implement Energy Improvement System – reduce energy costs, reduce operating costs, more greenable enterprises and more market competitiveness.


Issue Energy Audit Report

i. To analyze existing energy utilization performance

ii. To identify Energy Management Opportunities (EMO)

iii. To do cost benefits analysis of EMO

iv. To make recommendations to achieve energy efficiency and energy cost reduction

v. To propose financial measures and payback analysis


Procedures for General Energy Audit

i. A site visit to assess the building and energy consuming equipment

ii. Analysis of the utility bills to determine whether savings can be made by changing the utility rate

iii. A summary of utility bill data

iv. Calculation of the energy use intensity (EUI)

v. Estimate of the energy and costs saved if the building met an energy use intensity target


To further promote building energy efficiency, the Government enacted the Buildings Energy Efficiency Ordinance cap.610 which has come into full operation since 21 September 2012.


The 3 key requirements of the Ordinance

1. The developers or building owners of newly constructed buildings should ensure that the 4 key types of building services installation therein, namely, air-conditioning installation, lighting installation, electrical installation as well as lift and escalator installation, comply with the design standards of the Building Energy Code (BEC).

2. The responsible persons (i.e. owners, tenants or occupiers etc.) in buildings should ensure that the 4 key types of building services installation therein comply with the design standards of the BEC when “major retrofitting works ” are carried out.

3. The owners of commercial buildings (including the commercial portions of composite buildings, e.g. shopping malls under residential storeys) should carry out energy audit for the 4 key types of central building services installation therein in accordance with the Energy Audit Code (EAC) every 10 years.


Procedures for Energy Audit of Existing buildings

i. If you are the owner of commercial building or commercial portion of composite building, contact us to do energy audit for Central Building Services Installations.

ii. We can conduct Energy Audit, “Energy Audit Form EE5” and complete Energy Audit Report.

iii. We will submit to EMSD, within 30 days of the issuance of Energy Audit Form EE5, the Energy Audit Form and copy of Energy Audit Report.

iv. After the Energy Audit, building owner should display in visual location “Energy Audit Form” near main entrance of the building.

v. The “Energy Audit Form” will take into effect upon completion of the Energy Audit and is valid for 10 years. Before expiry date of 10 years, sufficient time should be allowed to do renewal of the Energy Audit.


Procedures for Energy Audit of Newly Constructed Building 

i. Within 2 months of the “Consent to the commencement of Building Works” issued by Buildings Department, new building developer or owner shall recruit Registered Energy Auditor to submit to the Buildings Department “Stage One Declaration Form”, ie. EE1.

ii. After completion of the building works, Registered Energy Auditor shall carry out site inspection for Energy Audit and submit to EMSD “Stage Two Declaration Form”, ie. EE2 within 4 month period after “Occupant Acceptance Form” issued by the Buildings Department. Under normal circumstances in the following 3 months, EMSD will issue “Certificate of Compliance Registration”.


Procedures for Energy Audit of Retrofitting Works 

Before completion of retrofitting works, property owner, tenant or occupant shall recruit Registered Energy Auditor to inspect on site and submit to EMSD “Form of Compliance”, ie. EE4 within 2 months after completion of the works.

Our Engineering Teams have been conducting Energy Audits over 5 years. Our customers include hotels, grade A offices, and shopping complex. We have Registered Professional Engineers, Chartered Engineers, Registered Energy Auditors and Experienced Professionals conducting quite a number of Energy Audits and Retro-commissioning studies.

So, call us today or send us an e-mail to ask for a free quote or consulting.